School of the Built Environment University of Ulster at Jordanstown Newtownabbey BT37 0QB Telephone Number: 028 9036 8352 E-mail: h.odeyinka@ulster.ac.uk Dr Henry A. Odeyinka ______________________________________________________________________________________
EDUCATION
2000 - 2003: Glasgow Caledonian University, Glasgow, UK. PhD in Construction Management and Economics
Jan.-June 1993: Institute for Housing and Urban Development studies, Rotterdam, The Netherlands. Postgraduate Diploma with Commendation in Project Management
1986-1987: University of Lagos, Lagos, Nigeria. M.Sc. in Construction Management
1979-1984: University of Ife, Ile-Ife, Nigeria (Now Obafemi Awolowo University) B.Sc. (Hons.) Quantity Surveying
MEMBERSHIP OF PROFESSIONAL ASSOCIATIONS
Associate, Nigerian Institute of Quantity Surveyors (ANIQS) Royal Institute of Chartered Surveyors (Registration through the academic route in progress) Member, Association of Researchers in Construction Management (ARCOM)
RESEARCH INTERESTS
Construction cash flow management, risk management in construction and construction procurement management.
RESEARCH PUBLICATIONS (Refereed)
1. Odeyinka H.A. (2007) Modelling risk impacts on the budgeted cost of traditionally procured building projects. In: Boyd, D. (ed.) Proceedings of The 23rd Annual ARCOM Conference, University of Ulster, Belfast, September 3-5. 2. Odeyinka H.A. & Ojo G.K. (2007) A conceptual framework for assessing risk impacts on clients’ cash flow. In: Egbu, C. (ed.) Proceedings of The 3rd Conference for Postgraduate Researchers of the Built &Natural Environment (PRoBE), Glasgow Caledonian University, Glasgow, November 20-22.
3. Aibinu A.A and Odeyinka H.A. (2006) Construction delays and causative factors in Nigeria. ASCE Journal of Construction Engineering and Management, 132 (7), Pp 667-677.
4. Oladapo A.A. and Odeyinka H.A (2006) Tender evaluation methods in construction projects: a comparative case study. Acta Structilia, Journal for the Physical and Development Sciences, 13 (1), Pp 106 – 131. Published by the University of the Free State, Bloemfontein, South Africa
5. Odeyinka H.A, Oladapo A.A. and Akindele O. (2006) Assessing risk impacts on construction cost. In: Sivyer, E. (ed.) Proceedings of the RICS Foundation Construction and Building Research Conference (COBRA), University College, London, September 7-8, Pp 490-499.
6. Odeyinka H.A, Davison, C. and Olomolaiye, A. (2005) An Assessment of Factors inhibiting Designers from Complying with Health and Safety Regulations in their Design. In: Khosrowshahi, F. (ed.) Proceedings of The 21st Annual ARCOM Conference, School of Oriental and African Studies, London, September 7-9, Pp 905-913.
7. Odeyinka H.A. and Kaka A. (2005) An evaluation of contractors’ satisfaction with payment terms influencing construction cash flow. J. Financial Management of Property and Construction. 10(3), 171-180.
8. Odeyinka, H.A, Oladapo, A.A and Omolade Z.A. (2005) A Multi-Attribute Approach to Tender Evaluation in the Context of Global Construction. In: Fadare, W, Ajayi, A, Amole, D and Babalola, B. (eds.) Proceedings of the Conference on Globalisation, Culture and the Nigerian Built Environment, Obafemi Awolowo University, Ile-Ife, Nigeria, June 15-17, Pp 177-184.
9. Odeyinka, H.A, Oladapo, A.A and Dada, J.O. (2004) An Assessment of Risk in Construction in the Nigerian Construction Industry. In: Ogunlana, S, Charoenngam, C, Herabat, P and Hadikusumo, B.H.W. (eds.) Proceedings of CIB W 107 and TG23 Joint International Symposium on Globalisation and Construction, Asian Institute of Technology, Bangkok, Thailand, November 17-19, Pp 359-368 on CD. [CD-ROM].
10. Yusif A. and Odeyinka H.A (2003): Performance evaluation of the Petroleum Trust Fund Educational and Health Infrastructure Rehabilitation Programme in North Western Nigeria. Acta Structilia, Journal for the Physical and Development Sciences, 10 (1&2), Pp 93 – 114. Published by the University of the Free State, Bloemfontein, South Africa
11. Odeyinka H.A, Kaka A. & Morledge R. (2003) An evaluation of construction cash flow management approaches in contracting organizations. In: Greenwood, D. (ed.) Proceedings of 19th Annual ARCOM Conference, University of Brighton, September 3-5, Pp 33-41.
12. Odeyinka H. A & Yusif A. (2003): An Assessment of the Accuracy of Quantity Surveyors’ Preliminary Cost Estimates in Nigeria. Construction Engineering Journal, 18 (1) Pp 33-38. Pontificia Universidad Catholica de Chile.
13. Odeyinka H.A, Lowe J.G. & Kaka A. (2002a) A regression model for assessing risk impacts on construction cost flow. In: Khosrowshahi, F. (ed.) Proceedings of The 3rd International Conference on Decision Making in Urban and Civil Engineering held at the School of Oriental and African Studies, London, November 6-8, 2002 on CD. [CD-ROM]. Available from Abacus Data and Document Capture, London.
14. Kaka A. & Odeyinka H. A (2002b) An artificial neural network net cash flow model. In: Khosrowshahi, F. (ed.) Proceedings of The 3rd International Conference on Decision Making in Urban and Civil Engineering held at the School of Oriental and African Studies, London, November 6-8, 2002 on CD. [CD-ROM]. Available from Abacus Data and Document Capture, London.
15. Odeyinka H.A, Lowe J.G. & Kaka A. (2002c) A Construction Cost Flow Risk Assessment Model. In: Greenwood, D. (ed.) Proceedings of 18th Annual ARCOM Conference, University of New Castle Upon Tyne, September 2-4, Pp 3-12.
16. Odeyinka H.A & Lowe J.G. (2002d) A Factor Approach to the Analysis of Risks influencing Construction Cost Flow Forecast. In: Morledge, R. (ed.) Proceedings of the RICS Foundation Construction and Building Research Conference (COBRA), Nottingham Trent University, September 5-6, Pp 120-131.
17. Odeyinka H.A. & Lowe J.G. (2001a) An evaluation of methodological issues for assessing risk impacts on construction cash flow forecast. In: Akintoye, A (ed.) Proceedings of 17th Annual ARCOM Conference, University of Salford, September 5-7. Pp 381-389.
18. Odeyinka H.A. & Lowe J.G. (2001b) An analysis of the impacts of risks and uncertainties on construction cash flow forecast. In: Kelly A. & Hunter K. (Eds.) Proceedings of the RICS Foundation Construction and Building Research Conference (COBRA), Glasgow Caledonian University, September 3-5, 2001. Pp 37-47.
19. Odeyinka H.A. & Lowe J.G. (2000) An assessment of risk factors involved in modelling cash flow forecasting. In: Akintoye, A (ed.) Proceedings of 16th Annual ARCOM Conference, Glasgow Caledonian University, September 6-8, 2000. Pp 557-565.
20. Odeyinka H.A. (2000) An evaluation of the use of insurance in managing construction risks. Construction Management and Economics, 18, Pp 519-524.
21. Odeyinka H.A, Wahab K.A. & Yusif A. (2000) Productivity improvement in construction through work measurement technique. Construction in Nigeria, 15 (2), Pp 16-25.
22. Yusif A. & Odeyinka H.A. (2000) An evaluation of tendering practice in the Nigerian Construction industry. Construction in Nigeria, 15 (2), Pp 3-7.
23. Odeyinka H.A. & Iyagba R.I. (2000) Risk management in construction to avoid cost overrun. The Quantity Surveyor. 31, Pp 14-21.
24. Odeyinka, H. A, Adesanya, D. A. and Yusif A. (1999): Construction equipment policy for indigenous and foreign contractors in Nigeria. Construction in Nigeria, 14 (1), 7-15.
25. Odeyinka, H.A. (1998): An assessment of the involvement of the Quantity Surveyor in Local Government Construction Works. The Quantity Surveyor, Vol. 23, Jan. - Apr. Pp. 15-23.
26. Odeyinka H.A. & Yusif A. (1997) The causes and effects of construction delays on completion cost of housing projects in Nigeria. Journal of Financial Management of Property and Construction, 2 (3), Pp 31-44.
27. Odeyinka H.A. and Yusif A. (1997): The effects of construction planning and organisational structure on site productivity. Construction in Nigeria. 12 (2) Pp. 3-13.
28. Odeyinka, H.A. (1993): “Risk and its Effects on Construction Cost” Construction in Nigeria, Vol.12 No. 1., pp. 21-26.
|